- What is the difference between “construction cost estimating’ and “construction cost control’?
- Briefly describe at what phase(s) do we need to estimate the construction cost and who will be
responsible for preparing this estimate.
- List five specific types of each of the “direct” and “indirect” cost items in construction.
- Describe in your own words the process of construction cost control.
- What is the difference between “planning” and ‘scheduling’?
- What is a Work Breakdown Structure (WBS)? Why is it needed?
- Briefly describe the steps needed to plan a construction project.
- How do we shorten the duration of a construction project, when needed?
- List and briefty describe the data that need to be collected to keep a construction schedule updated.