ESTIMATION, MEASUREMENT AND SCHEDULING (EC211C).

ESTIMATION, MEASUREMENT AND SCHEDULING (EC211C). ASSIGNMENT 2. Take off quantities, in accordance with SMM7 (7th Ed), for all of the work required, (excavation, groundwork and filling, concrete, and brickwork), for the foundation shown on Drawing No 2, (attached). Please make sensible assumptions for any information not provided. Any assumptions made should be reported in a query sheet. Marks will be awarded for: 1. 2. 3. 4. 5. 6. 7. Take-off list and introductory information; Accuracy of dimensions; Correct descriptions; Compliance with SMM7 rules; Clarity and comprehensibility of method; Setting out and presentation of dimensions; Queries raised and assumptions made (if any) A A PLAN SCALE 1:50 SECTION A-A SCALE 1:20 Title Drawing No. FOUNDATIONS 2. DRAWING B Scale Date Drawn 1/50 & 1/20 21 November 2014 EC211C PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET AN AMAZING DISCOUNT :)

IS IT YOUR FIRST TIME HERE? WELCOME

USE COUPON "11OFF" AND GET 11% OFF YOUR ORDERS