Shop Floor Control MRP

Investigate the term “Shop Floor Control” by performing an Internet search. Then, define Shop Floor Control and relate this subject to Material Requirements Planning (MRP)
Do you believe that an 8-week course in Shop Floor Control is necessary for you to understand how it relates to MRP? Or, can we learn enough about it (outside of the textbook) to achieve our academic goals without an in-depth study of Shop Floor Control? Why or why not?