You are a member of the design team assigned by a ‘property services’ practice

You are a member of the design team assigned by a ‘property services’ practice Technology 2, Year 2 / Level 5 COURSEWORK 2 ASSESSMENT BRIEF PROGRAMMES BSc (Hons) Architectural Design & Technology BSc (Hons) Building Surveying BSc (Hons) Construction Project Management BSc (Hons) Quantity Surveying BSc (Hons) Construction Management Submission Deadline: by 16:00 hrs (GMT) on Friday the 19 Dec 2014 This assessment contributes 50% of the marks for the above module. This coursework must be carried out individually. Scenario (hypothetical) The four-storey building indicated on the attached drawings is a proposed new building for the External Relations Division of The University of Salford, to be built on the former site of the Northern Car Park (currently under development). The attached schematic layouts have been prepared by architects acting for the University. The floor plans show how accommodation is to be broadly distributed, though in addition the following should be noted: Ground floor plan 0 One wing is an Office 0 The central area is a void over the swimming pool 0 The other wing provides internal car parking spaces as per the layout shown on the plans. Basement 0 Designated as plant and storage areas, swimming pool and Car Park. First and second 0 Designated as office use 0 The client requires flexibility of layout on these floors, i.e. to be able to partition off individual offices if the need arises, or to be able to have an open plan layout. 0 Layouts may change over a period of time. Top floor Technology 2 - Coursework 2 - 2014/15 University of Salford l

IS IT YOUR FIRST TIME HERE? WELCOME

USE COUPON "11OFF" AND GET 11% OFF YOUR ORDERS